Production & qualityDALANG, DONGGUAN · CHINA

Reliable production
needs visible control.

A practical view of the factory supply relationship: the operating facts we can share today, the checks agreed for each order and the way exceptions are handled.

Company-owned machines30

Computerized flat knitting machines. More are being added.

Planned monthly capacityApprox. 166,700 pcs

Annual plan divided across 12 months. Machine matching and achievable output require validation.

Planned annual capacity2 million pcs

Planning figure, subject to machine mix and order validation.

On-time completion target≥95%

Proposed management target, not a historical result.

Product pass-rate target≥97%

Proposed target for first inspection, not a historical result.

Production lead time20–45 days

Confirm the start/end milestones by style, quantity, materials and schedule.

Core gauges5GG · 7GG · 12GG

Selected around the design and hand feel.

Starting quantity100 pcs / style

30 pieces per colour.

Capacity figures are planning estimates and require validation against the machine mix and confirmed orders. Delivery and first-pass targets are proposed goals, not results from the previous 12 months.

Proposed monthly targets

Operating goals for the next 12 months.

These are proposed monthly targets. They are not historical performance results.

Plan monthOn-time completion targetFirst-pass product targetPlan monthOn-time completion targetFirst-pass product target
M01≥95%≥97%M07≥95%≥97%
M02≥95%≥97%M08≥95%≥97%
M03≥95%≥97%M09≥95%≥97%
M04≥95%≥97%M10≥95%≥97%
M05≥95%≥97%M11≥95%≥97%
M06≥95%≥97%M12≥95%≥97%

On-time rate = orders completed by their due date ÷ orders due. Product pass rate = units passing first inspection ÷ units first inspected.

Corrective-action workflow

Customer request → Factory solution → Final result

Illustrative measurement issue and proposed response. The specific order, date and inspection records still require factory verification.

01

Customer request

A bulk inspection found part of the chest measurement outside the customer’s permitted tolerance.

02

Factory solution

Knitted-panel density and the finishing process were not being controlled consistently.

The affected batch was paused, the process was adjusted, and the garments were re-inspected and reworked.

03

Result and prevention

The batch passed the agreed customer requirements after the corrective work.

Prevention: Add first-piece post-wash measurement approval and in-line density checks during production.

Before production starts

Agree the checks
before the pressure.

We will turn your requirements into a project-specific production and inspection plan.

Discuss production requirements
Your next collection starts here

Let’s make something
uniquely yours.

A sketch, a sample, or simply an idea.
Tell us where you’d like to begin.

Start your project